| S# | ADP | Scheme Code | Name of Scheme | Completion Date | Details |
|---|---|---|---|---|---|
| 1 | 1495 | 200327 | CONSTRUCTION OF ROAD CONNECTING SUB-DIVISION WAZIR TO BANNU CIRCULAR ROAD BANNU.Total length (43 Km). | Sep, 2025 | Details |
| 2 | 1274 | 180163 | CONSTRUCTION OF ROAD FROM KRAPA TO SHAKARDARA DISTRICT KOHAT (LENGTH = 31.744 KM) | june 30 2026 | Details |
| 3 | 1496 | 220638 | Feasibility Study, Detailed Engineering Design and construction of dualization of road from Indus Highway to Bannu City (26-KM)PDWP 31-10-2022. | june 30 2026 | Details |
| 4 | 1271 | 170523 | F/S & CONSTRUCTION OF CIRCULAR BYPASS ROAD, BANNU Total length = 41 Km | Aug 30 2026 | Details |