| S# | ADP | Scheme Code | Name of Scheme | Completion Date | Details |
|---|---|---|---|---|---|
| 1 | 1286 | 220397 | CONSTRUCTION OF ROAD FROM PATRAK TO THAL KUMRAT, DISTRICT UPPER DIR (44-KM) | oct, 2025 | Details |
| 2 | 1289 | 220406 | Construction of Shaheeda Sar to Etay Khwar, Sar Kala to Bar Teraj Road and improvement of Btara to Shangra Road District Buner. | May 2026 | Details |
| 3 | 1285 | 210454 | ADP NO. 1285/210454_F/S AND CONSTRUCTION OF KHWAZAKHELA BYPASS ROAD (5.10 KM), DISTRICT SWAT PDWP 10-09-2021 | June, 2026 | Details |
| 4 | 1263 | 140620 | Re-Construction of Bridge at Tor Warsak Daggar & Widening/Improvement & BT of 18 KM Leftover Portion of Swarai Pirr-Qilla Puran Road, District Buner. | June, 2025 | Details |
| 5 | 1265 | 140623 | Construction of Road from Balambat Timergara to Kalpani Maidan Link Road, District Dir Lower (10km) | june, 2025 | Details |
| 6 | 1266 | 140829 | Improvement of 25 KM left over portion of Chukiyatan- Barawal-Shahi Road, District (Dir Upper). | june 30 2026 | Details |
| 7 | 1272 | 170566 | Widening & Improvement and BT of Swari, Dewana Baba road (11 km) including RCC Bridge at Tangu,District Buner. (Road 11 km) (Bridge 75 meter) (R). | june 30 2026 | Details |
| 8 | 1279 | 190556 | F/S / D & Recon: of Bridges: Arsala(40 meter),Aghan Pur (20 meter),Drwaza Kas(30 meter),Doghi(25 meter), Khyali (225 meter), Matra(35 meter),Machni (120 meter),Kababian (12 meter),Gwalerai (70 meter,Aloch Puran(30 meter),Chena on Swari- Ambla rd | june 30 2026 | Details |
| 9 | 1284 | 210452 | Feasibility Study and Construction of Chupryal Bypass road (2.5 km) District Swat. | june 30 2026 | Details |
| 10 | 1285 | 210454 | Feasibility Study and Construction of Khwazakhela Bypass road (5.10km) District Swat. | june 30 2026 | Details |
| 11 | 1288 | 210983 | Widening & Rehabilitation of Road from Baryam Chowk to Wanai Matta District Swat (10.3 km). | june 30 2026 | Details |
| 12 | 1222 | 210516 | F/S , Design and Construction of Grade separated intersection at Shaheed Chowk Timergara (800 Meter). | june 2025 | Details |
| 13 | 1228 | 210769 | F/S AND CONSTRUCTION OF BUNER KARAKAR TUNNEL, DISTRICT BUNER) (2.1km). | Feb 06 2026 | Details |
| 14 | 1270 | 160630 | F/S, DESIGN AND CONSTRUCTION OF 2 NO. FLYOVERS ON MINGORA KANJU ROAD SH: MINGORA Bypass & Kanju Chowk Distt Swat (Mingora Flyover 850 meter) (Kanju bypass 7.2km). | Aug, 2025 | Details |
| 15 | 1281 | 190559 | F/S, DETAILED ENGG & CONSTRUCTION OF MATTA BYPASS ROAD (3.16 + 6 = 9.16 km) DISTRICT SWAT. | june , 2025 | Details |